Please sign in to edit, using the button at the upper right corner of the page.
If you would like your name changed, contact Mg27713.


Difference between revisions of "Campus Map"

From Gunn Wiki
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
[[Category:Campus]]
 
[[Category:Campus]]
There are a few campus maps/site plans of Gunn available online, though due to the recent construction none of them are both up-to-date and to-scale. In a Titan Town Hall, PAUSD Civil Rights and Legal Coordinator Robert Andrade mentioned that detailed campus floor plans cannot be revealed out of the fear of a school shooting. At any rate, we've tried to obtain some that are at least geometrically accurate, and here they are:
+
Gunn is big. Maps are good. Details are good.
  
 
== Updated maps ==
 
== Updated maps ==
 
A to-scale map (the same map put on the Gunn website) is available here: https://resources.finalsite.net/images/v1737500165/pausdorg/zmi9kqvwvpzd975e09bz/GunnSiteMap2025-26.pdf
 
A to-scale map (the same map put on the Gunn website) is available here: https://resources.finalsite.net/images/v1737500165/pausdorg/zmi9kqvwvpzd975e09bz/GunnSiteMap2025-26.pdf
 
+
[[File:GunnSiteMap2025-26-1.png|center|frameless|1000x1000px]]
== Out-of-date maps ==
 
 
 
=== OSM ===
 
A map from OpenStreetMap, an open-source map which shows the outlines of Gunn's buildings and their letters, but not classroom numbers:[[File:Screenshot 2024-04-30 3.11.47 PM.png|center|The map from OpenStreetMap, taken on 2024-04-30|alt=]]
 
 
 
=== UGWA ===
 
A to-scale, but outdated map from [[UGWA]] which shows classrooms.
 
[[File:Newmap.png|center|thumb|1000x1000px]]
 
 
 
=== Old official map ===
 
This one was the official campus map before construction was finished. It has awful dimensional accuracy.
 
[[File:Gunn campus map.webp|center]]
 
  
 
== Floor plans ==
 
== Floor plans ==
Floor plans are more detailed than normal maps.
+
Floor plans are more detailed than normal maps. Most if not all of these were obtained records of district meetings, so changes may have been made prior to construction. They should generally be accurate, though. Click the images to see a larger version. 
  
 
=== A and B buildings ===
 
=== A and B buildings ===
In December of 2024, the A and B buildings opened after being under construction for about a year and a half. The following floor plans were obtained via a records request, but they are also available online [https://go.boarddocs.com/ca/pausd/Board.nsf/files/BPSQJE688322/$file/20200526GunnABKRenovationPresentation.pdf here].
+
In December of 2024, the A and B buildings opened after being under construction for about two and a half years. The following floor plans were obtained via a records request, but they are also available online [https://go.boarddocs.com/ca/pausd/Board.nsf/files/BPSQJE688322/$file/20200526GunnABKRenovationPresentation.pdf here].
 +
 
 
[[File:Floorplan.webp|center|1000x1000px]]
 
[[File:Floorplan.webp|center|1000x1000px]]
 
[[File:Image.IA16Y2.webp|center|1000x1000px]]
 
[[File:Image.IA16Y2.webp|center|1000x1000px]]
 +
 +
=== P building ===
 +
The second-floor classrooms depicted are currently occupied by the Wellness Center and College and Career Center. Obtained from this presentation: https://records.pausd.org/WebLink/DocView.aspx?id=6326&dbid=0&repo=PAUSD
 +
[[File:P building first floor.png|center|950x950px]]
 +
[[File:P building second floor.png|center|950x950px]]

Latest revision as of 06:01, 15 February 2025

Gunn is big. Maps are good. Details are good.

Updated maps

A to-scale map (the same map put on the Gunn website) is available here: https://resources.finalsite.net/images/v1737500165/pausdorg/zmi9kqvwvpzd975e09bz/GunnSiteMap2025-26.pdf

GunnSiteMap2025-26-1.png

Floor plans

Floor plans are more detailed than normal maps. Most if not all of these were obtained records of district meetings, so changes may have been made prior to construction. They should generally be accurate, though. Click the images to see a larger version.

A and B buildings

In December of 2024, the A and B buildings opened after being under construction for about two and a half years. The following floor plans were obtained via a records request, but they are also available online here.

Floorplan.webp
Image.IA16Y2.webp

P building

The second-floor classrooms depicted are currently occupied by the Wellness Center and College and Career Center. Obtained from this presentation: https://records.pausd.org/WebLink/DocView.aspx?id=6326&dbid=0&repo=PAUSD

P building first floor.png
P building second floor.png