Difference between revisions of "Campus Map"
Line 1: | Line 1: | ||
− | There are a few campus maps of Gunn available online, though due to the recent construction few of them are both up-to-date and to-scale. | + | There are a few campus maps of Gunn available online, though due to the recent construction few of them are both up-to-date and to-scale. In a Titan Town Hall, PAUSD Civil Rights and Legal Coordinator Robert Andrade mentioned that detailed campus floor plans cannot be revealed out of the fear of a school shooting. At any rate, we've tried to obtain some that are at least geometrically accurate, and here they are: |
== OSM == | == OSM == | ||
Line 14: | Line 14: | ||
== New Construction == | == New Construction == | ||
In December of 2024, the A and B buildings opened after being under construction for about a year and a half. The following floor plans were obtained via a records request. | In December of 2024, the A and B buildings opened after being under construction for about a year and a half. The following floor plans were obtained via a records request. | ||
− | [[File: | + | [[File:6775647_gunn_abk_sd_plans-2.png|alt=|center|1000x1000px]] |
+ | [[File:6775647_gunn_abk_sd_plans-1.png|alt=|center|1000x1000px]] |
Revision as of 04:56, 18 December 2024
There are a few campus maps of Gunn available online, though due to the recent construction few of them are both up-to-date and to-scale. In a Titan Town Hall, PAUSD Civil Rights and Legal Coordinator Robert Andrade mentioned that detailed campus floor plans cannot be revealed out of the fear of a school shooting. At any rate, we've tried to obtain some that are at least geometrically accurate, and here they are:
OSM
A map from OpenStreetMap, an open-source map which shows the outlines of Gunn's buildings and their letters, but not classroom numbers:
UGWA
A floor plan from UGWA, which is not up-to-date but is to scale and shows classrooms:
Official Gunn Website
This one is the official campus map, which is more-or-less up to date but has just awful dimensional accuracy.
New Construction
In December of 2024, the A and B buildings opened after being under construction for about a year and a half. The following floor plans were obtained via a records request.